Change orders after paving.
The entrance is paved and striped when the owner asks for a gate call box on the opposite island. Your gate installer needs a path from the control cabinet to the pedestal. That added conduit is the change order illustrated here.
Request a quoteThe existing cabinet and the late-added pedestal define the crossing.
The drill crosses beneath the finished entrance toward the new call box.
Conduit follows the new route back beneath the striped pavement.
The new duct reaches the pedestal for the access-control installer.
How the work unfolds.
Turn the change order into two endpoints
Put the revision over the latest site plan and identify the cabinet, pedestal and exact conduit entries. Confirm the low-voltage or electrical contractor’s duct requirements. Knowing which company supplies sleeves, boxes and final connections avoids a gap between trades.
Fit the bore around completed work
Look at the work the original drawings may miss. Recently installed irrigation, lighting feeds, gate loops and privately owned conduits can be close to the new alignment. Use current site records and coordinate field verification, equipment access and a workable traffic window.
Place conduit between the cabinet and island
Lay out the specified duct at the exit and pull it back through the prepared bore. Agree on the handoff at each end before pulling. A stub that reaches the island can still miss the access-control installer’s mounting footprint or interfere with the gate operator base.
Give the installer a usable entry
Confirm the duct ends are accessible, protected and identified. Record the route and endpoints on the change-order sketch while the access openings are visible. The installing trade can then pull cable, mount the pedestal and connect the equipment.